Categories
Super Structure

Superstructure Rear

This past week I have been working on the rear of the superstructure. The wall of armour plating has been continued around the back and I’ve added a small curved section of railing around the chimney stack. The chimney stack has also been extended downwards to connect to the main deck.

On the main chimney stack I’ve added some baffles to the opening to provide some interest and detail. I have also fitted a ‘wooden’ platform around the stack as a possible sniper position for a grot or two.

I’ve also added some drips on to the side of main chimney stack where it sits below the oozing pipe.